When the frame does not match the engineering: Truganina frame findings
Beams at the wrong size, connections fixed another way and strongbacks without grips. Why frame stage on a Truganina build is a drawings exercise.
Fixing is the stage after plaster, doors and cabinetry go in. We check the finish and fit inside and the brickwork, joints, gutters and drainage outside before the painter covers anything.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
By fixing stage a Truganina house looks nearly finished, which is why items slip through. Expansion joints that stop short of the top of the wall, mortar left in weep holes and joints, cracked window glass and gutters that leak at their joins are all much quicker to fix before painting and site clean up.



Annotated findings from Fixing inspections.





1Bored piersWith the holes drilled and cages placed, before the concrete truck is booked
2Slab pre-pourSteel tied, pods down, plumbing in, and the pour still a day or two away
3FrameRoof trusses on, frame complete, and nothing wrapped or clad yet
4Lock-up (pre-plaster)Bricks laid, windows fitted, roof on, and the plasterboard not yet delivered
6WaterproofingMembrane cured in every wet area, tiles still in their boxes
7Pre-handover (PCI)Builder says the home is complete and before you pay the final claim
Beams at the wrong size, connections fixed another way and strongbacks without grips. Why frame stage on a Truganina build is a drawings exercise.

Shower set-downs under the wall line, slab edges in the cavity and honeycombed concrete. What we measure when the frame first sits on the slab.

Why the lock-up visit on a Truganina build rechecks the frame report, and what a cut top plate, slack bracing and missing tie-downs have in common.
Instant online pricing, or talk to the booking team on 1300 471 805.
Plaster finish and joints, cornices, skirtings and architraves, door hang and latching, and cabinet fixing and alignment.
Brickwork, expansion joints, weep holes, glass, gutters, downpipes and the roof cover, which is rechecked for tiles moved by later trades.
Small cracks can appear as the house takes its load. We measure and categorise them against the Guide to Standards and Tolerances 2015 so you know whether to monitor or raise them.
It should be in the meter box by completion. We note whether it is there yet so it is not forgotten.
Most Truganina houses take between one and two hours.
No. Fixtures are looked at for fit and damage. Plumbing and appliances are checked by their trades.