Truganina Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

PCI inspection in Truganina

Practical completion is when the builder says the house is finished. The PCI checks that claim room by room and up on the roof before you accept the keys.

  • Builder says the home is complete and before you pay the final claim
  • 2 to 3 hours on site
  • Report within 24 hours
Price your inspectionSend your details and the inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage7 of 7
When to bookBuilder says the home is complete and before you pay the final claim
Time on site2 to 3 hours on site
Inspected againstThe Guide to Standards and Tolerances 2015, the NCC, your contract drawings and inclusions

What is included in a Truganina pre-handover (PCI) inspection

  • Roof tiles, cappings and penetrations
  • Flashings sealed against the cladding
  • Gutter falls, brackets and box gutters
  • Shower screens, niches and floor falls
  • Taps and mixers checked for leaks
  • Upstairs window restrictors at 125mm
  • Door clearances and binding
  • Plaster cracks, paint and cornices
  • Tiling, grout and silicone
  • Kitchen joinery against the drawings
  • Weep hole and cladding ground clearance
  • Grading away from the slab
  • Insulation in the roof space
  • Condensate and stormwater discharge points
Why it matters here

Pre-handover (PCI) inspections on Truganina builds

Across our Truganina handovers the roof produces the most serious findings: cracked tiles, flashings left unsealed against the cladding, penetrations without proper flashing, cappings screwed through the top. Inside, leaking showers and upstairs bedroom windows without the 125mm opening limit are the items that matter most.

What we find at this stage in Truganina

  • Upstairs windows opening wider than 125mm
  • Roof penetrations not flashed or sealed
  • Sarking cut or torn in the roof space
  • Ridge cappings fixed through the top
  • Shower enclosures leaking
  • Cladding too close to the soil
Door gap to frame outside the 2mm to 5mm range, so it needs adjusting, Truganina
Door gap to frame outside the 2mm to 5mm range, so it needs adjusting
Tile grout and joints poorly finished across several areas, Truganina
Tile grout and joints poorly finished across several areas
Weep holes less than 150mm above the ground beside them, Truganina
Weep holes less than 150mm above the ground beside them
Sample findings

Sample defects found during our pre-handover (PCI) inspections in Truganina

Annotated findings from Pre-handover (PCI) inspections.

Upstairs bedroom window opening wider than the 125mm child safety limit, found during a PCI inspection in Truganina
Upstairs bedroom window opening wider than the 125mm child safety limit
Roof penetrations not flashed and sealed, a direct path for water, found during a PCI inspection in Truganina
Roof penetrations not flashed and sealed, a direct path for water
Roof sarking cut or torn, removing a second line of defence against leaks, found during a PCI inspection in Truganina
Roof sarking cut or torn, removing a second line of defence against leaks
Ridge cappings screwed through the top instead of the sides, inviting leaks, found during a PCI inspection in Truganina
Ridge cappings screwed through the top instead of the sides, inviting leaks
Shower enclosure leaking water during the handover inspection, found during a PCI inspection in Truganina
Shower enclosure leaking water during the handover inspection

The other stages of a Truganina build

  1. Bored piers inspection in Truganina1Bored piersWith the holes drilled and cages placed, before the concrete truck is booked
  2. Slab pre-pour inspection in Truganina2Slab pre-pourSteel tied, pods down, plumbing in, and the pour still a day or two away
  3. Frame inspection in Truganina3FrameRoof trusses on, frame complete, and nothing wrapped or clad yet
  4. Lock-up (pre-plaster) inspection in Truganina4Lock-up (pre-plaster)Bricks laid, windows fitted, roof on, and the plasterboard not yet delivered
  5. Fixing inspection in Truganina5FixingPlaster up, doors hung, cabinets in, painters not yet started
  6. Waterproofing inspection in Truganina6WaterproofingMembrane cured in every wet area, tiles still in their boxes

All construction stage inspections in Truganina →

Guides

Construction stage guides for Truganina

All guides →

Book a pre-handover (pci) inspection in Truganina

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-handover (PCI) inspections in Truganina: common questions

What does the abbreviation PCI mean?

Practical completion inspection. It is the independent check before handover, sometimes called a pre-handover inspection.

How many hours should I allow for the PCI?

Two to three hours for a typical single storey Truganina home, longer for a double storey with a full roof check.

Is the roof covered in a Truganina PCI?

Yes, where safe access is possible. Many of the most serious handover findings in Truganina are on the roof.

Which documents is a Truganina PCI measured against?

Your contract and drawings, the NCC and the Guide to Standards and Tolerances 2015.

Am I able to come along to the PCI?

Yes, and we recommend it. We walk you through the main items at the end.

What should happen once the PCI report is in?

Send the report to your builder and agree a date for the items to be fixed. We can reinspect before you take possession.

CallGet a Free Quote