Frame inspection in Truganina

With the roof trusses up and the walls still open, the frame shows everything: beam sizes, connections, tie-downs, bracing and how the walls meet the slab.

  • Roof trusses on, frame complete, and nothing wrapped or clad yet
  • 1 to 2 hours on site
  • Report within 24 hours
Price your inspectionSend your details and the inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage3 of 7
When to bookRoof trusses on, frame complete, and nothing wrapped or clad yet
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Truganina frame inspection

  • Beam and lintel sizes against the engineering
  • Column and beam connections as specified
  • Tie-down straps, rods and washer sizes
  • Bracing walls continuous at top and bottom plates
  • Strongbacks secured at their ends
  • Top plate joints blocked and tied
  • Walls plumb within 5mm over 1.8m
  • Bottom plate overhang on the slab edge
  • Slab protrusion into the brick cavity
  • Wet area set-downs clear of the frame line
  • Noggings at spacing and around boxes
  • Window and door openings trimmed
  • Truss fixings and bearing points
  • Termite protection visible at the slab edge
Why it matters here

Frame inspections on Truganina builds

On Truganina frames we keep finding the same theme: what was built does not match the engineering. Beams installed at a different size, column connections fixed another way, strongbacks without their end grips. Each is easy to compare against the drawings now and impossible to see once the plasterboard goes up.

What we find at this stage in Truganina

  • Beams installed at sizes other than drawn
  • Connections that differ from the engineer's detail
  • Bottom plates hanging over the slab edge
  • Slab edge pushing into the brick cavity
  • Tie-down washers below the minimum size
  • Walls out of plumb beyond 5mm in 1.8m
Wall frame out of plumb by more than 5mm over 1.8 metres, Truganina
Wall frame out of plumb by more than 5mm over 1.8 metres
Tie-down bolts fitted with washers below the minimum size required, Truganina
Tie-down bolts fitted with washers below the minimum size required
Top plate joint left without the plate or strap that keeps it continuous, Truganina
Top plate joint left without the plate or strap that keeps it continuous
Sample findings

Sample defects found during our frame inspections in Truganina

Annotated findings from Frame inspections.

Beam installed at a different size from the one shown on the drawings, found during a frame inspection in Truganina
Beam installed at a different size from the one shown on the drawings
Bottom plates hanging more than 10mm past the slab edge, reducing their bearing, found during a frame inspection in Truganina
Bottom plates hanging more than 10mm past the slab edge, reducing their bearing
Column connection that does not match the fixing the engineer specified, found during a frame inspection in Truganina
Column connection that does not match the fixing the engineer specified
Tie-down straps missing where upper floor studs bear through the frame below, found during a frame inspection in Truganina
Tie-down straps missing where upper floor studs bear through the frame below
Bottom plate cut through in a bracing wall without an approved fix, found during a frame inspection in Truganina
Bottom plate cut through in a bracing wall without an approved fix

The other stages of a Truganina build

  1. Bored piers inspection in Truganina1Bored piersWith the holes drilled and cages placed, before the concrete truck is booked
  2. Slab pre-pour inspection in Truganina2Slab pre-pourSteel tied, pods down, plumbing in, and the pour still a day or two away
  3. Lock-up (pre-plaster) inspection in Truganina4Lock-up (pre-plaster)Bricks laid, windows fitted, roof on, and the plasterboard not yet delivered
  4. Fixing inspection in Truganina5FixingPlaster up, doors hung, cabinets in, painters not yet started
  5. Waterproofing inspection in Truganina6WaterproofingMembrane cured in every wet area, tiles still in their boxes
  6. Pre-handover (PCI) inspection in Truganina7Pre-handover (PCI)Builder says the home is complete and before you pay the final claim

All construction stage inspections in Truganina →

Guides

Construction stage guides for Truganina

All guides →

Book a frame inspection in Truganina

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Truganina: common questions

What paperwork do you need for the Truganina frame visit?

The engineering drawings, including the bracing and tie-down plan, and the architectural plans. Truss layouts help if you have them.

What if a beam differs from the size on the drawings?

The builder either replaces it or provides an engineer's certificate confirming the installed member is adequate. The report records which applies.

How much of the day does the frame visit take?

One to two hours on site, depending on the size of the house and whether it is double storey.

Are light gauge steel frames inspected as well?

Yes. Steel frames are checked against the manufacturer's details and the engineering, with the same focus on connections, bracing and tie-down.

Does the frame visit also look at the slab edge?

Yes. It is the first time the slab and frame are seen together, so overhangs and protrusions into the cavity show up here.

Are open frame items looked at again before plaster?

Yes, at lock-up we confirm whether the frame items have been fixed before plaster.